Installation
Included in the price
Installation of a Garenberg office in the garden is undertaken by our own professional team and is included in the standard price. It will take between 1 and 3 days according to the chosen size and options.
Pre Installation
Delivery lead time is approximately 6 weeks. During this period you need to ensure the site is sound and level with a slab or concrete base for the garden building foundation. Alternatively we can provide our hassle free foundation system as part of the installation. Garden buildings on sloping sites are also possible but will require a site survey.
A variable delivery charge is applied depending on postcode location. For delivery costs and foundation pricing please request a brochure.
On the Day
Garenberg’s experienced team are fast and efficient, creating minimum disruption. The garden office arrives in convenient panels that can be navigated through most access problems.
The base and floor is laid first and checked to verify it is level. Next the walls are erected and sealed and then the roof panels fitted. Lastly the windows, roof membrane, and trim are installed.
We then tidy up and temporarily connect the garden office electrics to guide you through using your office before we hand you the keys.
After installation you need to arrange for your local electrician to make the straightforward connection to the electrical supply.